What package is created for record of repairs when required by higher authority?

Study for the Gas Turbine Systems Technician – Mechanical (GSM) Chief Test. Access multiple choice questions with hints and detailed explanations. Be prepared for your upcoming exam!

The Control Work Package (CWP) is specifically designed to document and manage the records of repairs and maintenance activities conducted on equipment or systems. It serves as a comprehensive record that details the tasks performed, the materials used, the personnel involved, and any tests conducted after repairs. The CWP ensures that there is accountability and traceability of maintenance actions, which is vital when higher authorities require verification of compliance with maintenance standards and procedures.

The QAO (Quality Assurance Organization) typically focuses on ensuring quality standards are maintained throughout operations but doesn’t specifically pertain to the documentation of individual repairs. The DFS (Data Flow System) is used for managing information but not specifically for repair records. The NIIN (National Item Identification Number) is a unique identifier for items of supply but does not relate to the process of recording repairs. Thus, the CWP stands out as the systematic approach for documenting repair actions, making it the correct choice.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy